ROV inspection for offshore wind
Subsea inspection of wind farm structures, from a CTV, without divers
Offshore wind operators are under steady pressure to inspect ageing assets more often, more efficiently and more safely. We inspect monopiles, transition pieces, jacket structures, offshore substations, cable protection systems and sacrificial anodes with compact observation-class ROVs that deploy from a standard crew transfer vessel deck. The team plans each dive around the tide, measures what matters at depth, and reports every asset separately with video, sonar and survey files, so the operator gets a baseline per structure and a short list of items to plan maintenance around.
What we inspect at a wind farm
- Monopiles and transition pieces: general and close visual inspection, marine growth thickness measured at several depths, scour assessment around the monopile and cable entry.
- Jacket structures and offshore substations: every face, leg and node, cable risers, J-tubes, welded connections and boat landings.
- Cable protection systems: the full run from the bellmouth to the burial point, with exposed cable, misalignment and rock bag condition measured and positioned.
- Cathodic protection: anode condition and potential readings down each leg, confirming the corrosion protection is doing its job.
- Seabed: scour, debris and dropped objects around each structure.
How a wind farm campaign runs
We mobilise the Ocean Modules V8 M500, a compact, all-electric observation-class ROV with vectored thrust, full HD imaging and a 500 metre depth rating, onto a standard crew transfer vessel. It sets up in hours rather than days, needs no containerised spread, support vessel or platform crane, and is small enough to work in close to jacket legs, risers and J-tubes where larger systems struggle for access.
Strong tides are planned around rather than fought. The vessel ties off on the boat landing for each face of the structure and the ROV works methodically around the jacket during slack water windows, recovering when the tide builds and completing full faces, legs and risers in a single dive on better days. Each working day closes with a Daily Progress Report covering hours, scope progress, anomalies and CP data, so the client sees the campaign as it happens.
What you get back
- High-definition video and stills of every asset, reported separately
- Imaging sonar data and survey files per structure
- Marine growth thickness and anode potential readings at depth
- Scour assessment around every monopile and cable inlet
- Anomaly logs with positions, lengths and supporting imagery
- Daily progress reports during the campaign and a final report built from the daily record
Wind farm inspections we have done
At an operating wind farm we inspected eight wind turbine generators and the offshore substation with the V8 M500, measuring marine growth thickness and anode potentials at depth and assessing scour around every monopile and cable inlet. No major defects were found and every anode reading fell within the acceptable range, which gave the operator a baseline for each asset.
Off the North Wales coast we inspected two offshore substation platforms from a crew transfer vessel over nine days, mobilisation to demobilisation, covering every jacket face, leg and node, the cable risers and J-tubes, and full cathodic protection profiles down each leg. Both platforms were completed inside the planned window with no divers in the water.
Offshore wind farm inspection FAQs
Learn more about offshore wind inspection by ROV
Straight answers on what an ROV campaign covers, how it runs from a CTV and what you receive.
Can you inspect offshore wind structures from a crew transfer vessel?
Yes. The V8 M500 deploys from a standard CTV deck, so there is no need for a larger vessel or a containerised ROV spread. The vessel ties off at the boat landing for each face of the structure while the ROV works around the jacket or monopile.
How long does a subsea inspection of a wind farm structure take?
It depends on the structure, the scope and the tide. As a guide, two offshore substation platforms were inspected in full, including CP profiles down every leg, in nine days from mobilisation to demobilisation.
Do you measure cathodic protection and marine growth, or just look?
We measure. Anode potentials are read at a range of depths to confirm the corrosion protection is working, and marine growth thickness is measured at several depths on the structure so the hydrodynamic loading can be assessed rather than guessed.
Can you inspect cable protection systems as part of the campaign?
Yes. We survey the full CPS run from the bellmouth to the burial point by HD video and imaging sonar, logging exposed cable, misalignment and rock bag condition with positions and measurements. See our cable protection system inspection service for the detail.
How quickly can you mobilise?
The V8 M500 spread is compact enough to hand-carry onto the pier and transfer to a crew transfer vessel. On our North Wales substation campaign the topside was built, the CP equipment tested and the ROV wet-tested alongside by the end of the first day. For overseas work the kit can travel by air cargo: during our 2026 Taiwan season, photogrammetry equipment was shipped as a single pallet at short notice.
Do you need a crane on the vessel or the platform?
No. We bring our own portable launch and recovery arm, so the work does not depend on a platform crane or the vessel’s deck crane.
What happens when the tide or the weather turns?
Dives are planned around slack water. The vessel ties off on the boat landing that suits the current, and the ROV is recovered when the tide builds, then relaunched for the next window. In Taiwan, typhoons closed the site for days at a time and the scope was still delivered close to the agreed programme.
Can you inspect monopiles as well as jackets?
Yes. We have inspected monopiles and transition pieces on operating wind turbine generators, as well as jacket structures on offshore substations, covering marine growth, CP readings and scour around the monopile and cable entry. See the wind farm structures case study.
What do we receive, and when?
A Daily Progress Report at the end of every working day, covering hours, scope progress, anomalies and CP data. Video, stills, sonar and survey files are delivered for each structure, and the final report is built from the daily record.
Do you work outside the UK?
Yes. Alongside UK campaigns, we have run offshore wind inspection seasons in the Taiwan Strait from crew transfer vessels, covering foundations and cable protection systems. Read about the 2026 Taiwan season.
Can you add photogrammetry to the campaign?
Yes. Underwater photogrammetry can be added where a 3D record is useful, for example to look at cable protection system issues. In Taiwan it was mobilised part way through the season and the dataset was processed remotely.
What approvals and certifications do you hold?
Our management systems are certified to ISO 9001, ISO 14001 and ISO 45001. We hold DNV approval for in-water survey by remotely operated vehicle (DNV-CP-0628) and Lloyd’s Register approval as a service supplier for in-water survey of ships and mobile offshore units. View our certificates.
Why work with us?
Why operators choose us for wind farm inspection
Inspection on an operating wind farm comes down to the vessel, the tide and the people on deck. This is how we handle each of them.
We bring our own launch and recovery arm
The ROV goes over the side on our own portable launch and recovery arm, so the work does not depend on a platform crane or the vessel’s deck crane. The whole spread is hand-carried onto a standard crew transfer vessel and built up in a day: topside, satellite link, CP equipment and a wet test alongside.
There is no containerised system to ship and no larger support vessel to charter.
A compact ROV that works close to the steel
We run the Ocean Modules V8 M500, an all-electric, observation-class ROV with vectored thrust, full HD imaging and a 500 metre depth rating. It fits on a standard CTV deck and is small enough to work in close to jacket legs, risers and J-tubes, where larger systems struggle for access.
Nobody goes in the water
Wind farm sites are tidal, exposed and busy with vessel traffic. Every part of the inspection is done by ROV, so no diver has to work in the current, at the boat landing or around the structure. When the tide builds, the ROV comes out and the team waits for the next window.
Readings you can act on, not just video
Anode potentials are read down each leg, marine growth thickness is measured at several depths, and scour is assessed around every monopile and cable entry. Anomalies are logged with positions, lengths and supporting images, so findings can go straight into a maintenance plan.
A report every evening and a record for every structure
Each working day closes with a Daily Progress Report covering hours, scope progress, percentage complete, anomalies and CP data, and a satellite link on the vessel lets data move off site during the campaign. Every structure is reported separately with video, stills, sonar and survey files, and the final report is built from the daily record.
Dives timed to slack water
The vessel ties off on whichever boat landing suits the current, and launches are timed to slack water. On stronger tides the ROV is recovered until conditions ease; on better days the team completes full faces, legs and risers in a single dive. Knowing when to launch and when to stop comes from years of working offshore.
Wind farm campaigns in the UK and Taiwan
Our 2026 Taiwan season covered foundation and cable protection system inspection from crew transfer vessels, with three-hour transits, strong currents and typhoon closures. The scope was delivered close to the agreed programme, with a report to the client every evening. When photogrammetry was needed at short notice, the kit was shipped as a single pallet by air cargo.
The people running the job also supply and service the kit
Atlantas Marine sells, rents, services and trains on ROVs as well as running inspections. The team planning your campaign uses this equipment in real conditions and maintains it in our own workshop, so problems on site are handled by people who know the systems well.
Approvals and certification
Our management systems are certified to ISO 9001 for quality, ISO 14001 for environmental management and ISO 45001 for occupational health and safety. We also hold DNV approval for in-water survey by remotely operated vehicle under class programme DNV-CP-0628, and Lloyd’s Register approval as a service supplier for in-water survey of ships and mobile offshore units.
Copies of each certificate are on our certification page.
Speak to our team about an offshore wind farm inspection run from a CTV, with measured data for every structure and no divers in the water.
How can we help?
Tell us about your wind farm campaign
Send the ROV operations team a few details about the asset, the location and the timing, and we will come back to you with how we would approach it.